label
setting the mood…
Interiorsby
Get a Free Quote
Free Tools
All 20+ tools →
Services
All services →
Why Verified
Read reviews →
Our Work
All projects →
Guides & Blog
Guides hub →
For Pros
For Pros home →
Login to your dashboard
Call us WhatsApp
locked
Quote-Lock Guarantee

The quote you approve is the price you pay.

Industry quotes balloon 15–25% with hidden costs. Ours don't move. The itemised, GST-inclusive quote you approve is locked, to the rupee.

Get a Free Quote See Our Work
LOCKED
Verified.RealEstate Itemised BOQ · #VRE-3471
GST incl.
Modular kitchen₹3,24,000
Wardrobes & storage₹2,86,500
False ceiling & lighting₹1,48,000
TV & crockery units₹1,42,000
Painting, civil & services₹2,14,000
GST (18%, included)₹70,000
Grand total, locked
₹11,84,500
approve
one number, signed and sealed
what your final bill looks like
Industry overrun vs Quote-Lock
approved quote
+15–25%
Industry final
+₹1.8–3.0L
0 · locked
Your Verified bill
no change

Overrun range reflects widely reported industry estimates, not a specific company. A Quote-Locked project moves only by a change order you sign.

01
01 / The problem we fixed

The number quietly climbs after you sign.

Across India, interior quotes commonly balloon 15–25% after you commit. Hidden costs, vague line items and "site extras" appear once the work has already started, when saying no is hardest.

Our promise

The itemised quote is locked the moment you approve it. From that point, the only thing that moves the price is a change you ask for and sign.

An unlocked quote, week by week
Week 0Quote signed
₹11,84,500
Week 3"Site condition" extra
+58,000
Week 6Hardware "upgrade"
+1,14,500
Week 9Wiring & loading charges
+92,000
HandoverWhat you actually pay
₹14,49,000
+₹2,64,500 over quote (+22%)
02
02 / How it works

Four steps to a price that can't move.

You see every line before you commit. Once you approve, the number is locked and recorded in your dashboard.

01

Itemised BOQ

A line-by-line Bill of Quantities: material and labour, GST-inclusive. Nothing bundled, nothing hidden.

02

You review

Take your time. Question any line. We revise until the quote reflects exactly what you want.

03

You approve

You sign the quote you are happy with. That signature is the agreement, GST-inclusive.

04

It locks

The total is locked to the rupee. Any change is a signed, costed change order you approve first.

Verified.RealEstateQuote status · #VRE-3471
Final
BOQ issued21 line items · material + labour12 Jun 2026
Reviewed with you2 revisions · all queries closed18 Jun 2026
Approved & signedGST-inclusive · ₹11,84,50021 Jun 2026
Quote LockedPrice fixed to the rupee · 0 change orders 21 Jun 2026

A change order is the only thing that can move a locked price, and only after you approve and sign it.

03
03 / What's covered, in plain English

Everything in the approved BOQ is fixed.

The only thing that changes the price is a change you request and sign. Here is exactly what the lock holds, and what a change order is.

Every line item

Each material and labour line in your BOQ stays at the approved rate.

GST, included

The total is GST-inclusive. The tax does not get added on later.

Material rates

The grades you approved are priced in. No "market rate" top-ups.

Labour & installation

Fitting, carpentry and finishing are costed in the same quote.

Quantities you approved

Counts of shutters, units and fittings are fixed to the BOQ.

Design as signed

Building to the approved 3D and drawings carries no extra fee.

A change order is

A written, costed note for something you decide to add or change, for example a different stone or an extra unit. It shows the price impact, and it only takes effect after you approve and sign it.

A change order is not

A surprise charge for something already in your quote, a "site condition" we should have planned for, or a way to revisit the agreed rates. Those stay locked.

04
04 / How we compare

Two questions worth asking in writing.

We can only speak for our own process. Ask any firm these two questions and get the answer on paper.

the two questionsAsk before you sign InteriorsbyVerified.RealEstate National brands Local firms
Locked pricing, no post-signature increaseVariesVaries
Itemised, GST-inclusive quoteSometimesSometimes

Competitor columns are deliberately general. Practices vary widely between firms and individual projects; we make no claim about any specific company.

06
06 / Questions, answered

Quote-Lock, in plain terms.

Is the quote really fixed?
Yes. Once you approve the itemised quote it is locked, GST-inclusive, with no hidden costs. The total you sign is the total you pay.
What if I change something?
It becomes a signed, costed change order you approve before any work. You see the exact price impact first, so you are never surprised.
Are there any extra charges later?
No. Every line is in the quote up front, material and labour both. There are no "site extras" added after you commit.
Does the lock include GST?
Yes. Quotes are GST-inclusive and itemised, so the tax is part of the locked total and never added on at the end.
no hidden costs, ever

Get a quote that won't move.

A free, itemised, GST-inclusive quote you can lock on approval, from a designer who stays with you to handover.

Get a Free Quote The Verified Difference