label
setting the mood…
Interiorsby
Get a Free Quote
Free Tools
All 20+ tools →
Services
All services →
Why Verified
Read reviews →
Our Work
All projects →
Guides & Blog
Guides hub →
For Pros
For Pros home →
Login to your dashboard
Call us WhatsApp
0% OVERRUN Villa · ECR · Contemporary Luxe
Get a Free Quote
the receipts / project no. 0431

A Villa in ECR , warm, honest, on time.

Bare shell to handover in 78 days. One signed, itemised quote that never moved, materials you can scan to verify, and a paper trail for every rupee. Drag the divider below and see the difference for yourself.

ECR, Chennai Contemporary Luxe 3,200 sq ft 78 days, on time Locked ₹34.5L
Before · builder-finish flat
After · designed & furnished
Living + dining, warm minimal
Drag to reveal
02
chapter one / the brief

A young family, a fresh shell, and a wish list with a budget attached.

The clients
Karthik & Divya
First home, 1-year-old, both work in IT
ECR, Chennai 3,200 sq ft carpet Villa handed bare-shell

Karthik and Divya bought their first home in ECR and were handed a builder-finish shell: bare walls, no kitchen, no wardrobes. They wanted warmth without clutter, a kitchen that worked for two cooks, and a budget they could actually trust. They had been burned once by a "rough estimate" that ballooned, so honesty mattered as much as taste.

The wish list
Warm, modern, clutter-free living
A two-cook modular kitchen
Wardrobes in every bedroom
A dedicated, Vastu-correct pooja space
Storage that hides the toddler chaos
The challenges
Pooja room had to sit in the north-east, per Vastu, without eating into the foyer
A compact, narrow kitchen needed full storage and two work zones
Move-in deadline before the school term, non-negotiable
A firm ceiling on spend, with no surprises
Budget range agreed
₹30.5L to ₹36L
Turnkey, GST inclusive. We locked the final figure at ₹34.5L after the 3D sign-off.
03
chapter two / the concept

Designed in warm, photoreal 3D before a single rupee moved.

Two rounds of 3D took the home from a mood to a decision. What you approved is what we built.

Palette Warm whiteOatWalnutEspressoSageCharcoal
3D render · living
Living & dining, final concept
Material moodboard
Lighting & layout study
Concept v1 reviewed 02 Jan Revisions on kitchen + pooja 05 Jan Final 3D signed off 07 Jan
04
chapter three / the proof

The quote we signed is the bill they paid.

An itemised Bill of Quantities, material and labour split out, GST shown, locked the day the 3D was approved. Tap any room to open the line items.

Locked vs delivered
Quote locked
34.5 L
Delivered
34.5 L
0% cost overrun
Against the industry norm
Typical interior project+15–25% hidden cost
This project, Quote-Lock0% overrun
Bill of Quantities
BOQ- ECR 0431 · turnkey, GST inclusive
MaterialLabour
Living & Dining
₹7,30,000
TV unit + wall paneling (BWP 710) ₹2,62,000
L-shape sofa + coffee table ₹1,82,000
Dining set + crockery unit ₹1,59,000
Drapes, rug + decor ₹1,27,000
Material 60%Labour 40%
Modular Kitchen
₹6,07,000
Base + wall units (BWP 710 carcass) ₹3,11,000
Kalinga quartz countertop, 18mm ₹1,10,000
Tall unit + soft-close accessories ₹99,000
Backsplash, sink + faucet ₹87,000
Material 68%Labour 32%
Master Bedroom
₹5,02,000
Wardrobe 8x7 with loft (BWP) ₹2,31,000
Bed + bedside tables ₹1,40,000
Study nook + open shelving ₹78,000
Headboard paneling + paint ₹53,000
Material 62%Labour 38%
Guest Bedroom
₹3,70,000
Wardrobe + study combo ₹1,86,000
Bed with under-storage ₹1,06,000
Accent paint + soft decor ₹78,000
Material 60%Labour 40%
Pooja & Foyer
₹2,00,000
Pooja unit, north-east (Vastu) ₹99,000
Foyer console + mirror ₹63,000
Shoe storage bench ₹38,000
Material 64%Labour 36%
False Ceiling & Painting
₹3,51,000
Gypsum false ceiling + cove lighting ₹1,59,000
Premium emulsion, full home ₹1,16,000
Texture + accent walls ₹76,000
Material 45%Labour 55%
Electrical, Plumbing & Misc
₹2,08,000
Wiring, points, automation-ready ₹99,000
Plumbing + CP fittings ₹64,000
Site management + deep clean ₹45,000
Material 50%Labour 50%
Subtotal ₹29,68,000
GST (mixed 18% / 12%) ₹4,82,000
Locked totalGST INCLUSIVE
₹34,50,000
QUOTE LOCKED
08 JAN 2026

Once signed, the only way this number changes is a change order the client approves in writing, before any work. No change orders were raised. The home was delivered at exactly the locked figure.

05
chapter four / the materials

Every material, on record. Hover or tap to see the certificate.

No "equivalent" swaps on site. Grade, brand, origin and batch, all logged and verified on delivery.

Scan to verify
Plywood
tap or hover · see certificate
Plywood
BWP 710 · IS:710
BrandCentury Sainik 710
OriginYamunanagar, HR
BatchSK710-2401-AN
Verified on delivery
Scan to verify
Laminate
tap or hover · see certificate
Laminate
1mm · low-VOC
BrandGreenlam Suede
OriginBehror, RJ
BatchGL-SU-2312
Verified on delivery
Scan to verify
Hinges & Channels
tap or hover · see certificate
Hinges & Channels
Soft-close · 8-yr
BrandHettich Sensys
OriginGermany
BatchHT-SY-2026
Verified on delivery
Scan to verify
Quartz Countertop
tap or hover · see certificate
Quartz Countertop
18mm · food-safe
BrandKalinga Quartz
OriginIndia
BatchKQ-18-2401
Verified on delivery
Scan to verify
Emulsion Paint
tap or hover · see certificate
Emulsion Paint
Low-VOC · lead-free
BrandAsian Paints Royale
OriginMysuru, KA
BatchAP-RY-2402
Verified on delivery
Scan to verify
Adhesive
tap or hover · see certificate
Adhesive
Phenolic · IS approved
BrandFevicol Marine SH
OriginPune, MH
BatchFV-SH-2401
Verified on delivery
27 materials verified across this project · full log in the handover file
06
chapter five / the build

78 days, time-stamped at every milestone.

Geo-tagged site photos at each stage. The progress line fills as you scroll, just like the build did.

Day 0 13 Jan 2026 13.087N 80.209E

Demolition & site prep

Protection up, old fittings stripped, site measured and marked against the approved 3D.

site photo · 13 Jan 2026
Day 11 19 Jan 2026 13.087N 80.209E

Civil, plumbing & waterproofing

Kitchen and bath plumbing re-routed, wet areas waterproofed and tested before tiling.

site photo · 19 Jan 2026
Day 27 27 Jan 2026 13.087N 80.209E

Electrical & false-ceiling framing

New points and automation-ready wiring, gypsum framing and cove channels set out.

site photo · 27 Jan 2026
Day 42 04 Feb 2026 13.087N 80.209E

Woodwork & modular install

BWP 710 carcasses installed, kitchen and wardrobes fitted, quartz top templated and set.

site photo · 04 Feb 2026
Day 63 15 Feb 2026 13.087N 80.209E

Finishes, paint & polish

Laminates, paint, handles and lighting in. Pooja unit set true to the north-east.

site photo · 15 Feb 2026
Day 78 23 Feb 2026 13.087N 80.209E

Deep clean & verified handover

Snag list closed, deep clean done, warranty and material file handed over. Keys returned.

site photo · 23 Feb 2026
Delivered on the committed date · zero penalty days
07
chapter six / the transformation

Room by room, shell to home.

Before · bare living
After · warm minimal
The living room
Before
After
Two-cook modular kitchen
Before
After
Master bedroom

The finished home

Tap any photo to enlarge
Living & dining
Modular kitchen
Master bedroom
Pooja & foyer
08
chapter seven / the handover

Keys handed over with the paperwork to match.

Verified handover document

A signed handover pack: the snag report (all closed), the final BOQ, every material certificate and the as-built notes for each room.

Snag report · 0 openFinal BOQ · matched27 material certsAs-built drawings
Care instructions
Modular kitchen & wardrobes
Wipe shutters with a soft damp cloth, avoid abrasive scrubs. Keep hinges dry; a drop of light oil once a year keeps the soft-close smooth.
Quartz countertop
Daily mild soap and water. Wipe spills of acidic liquids promptly. No need to seal, quartz is non-porous.
Paint & false ceiling
Dust the cove with a dry microfibre cloth. Touch-up emulsion is labelled and left with you for minor marks.
Warranty certificate
12 years on custom work

The warranty is explicit: it covers the carpentry and modular work we built, not just the hardware brands. One document, one point of contact, for ten years.

Custom carpentry & modular units12 years
Hettich hardware & soft-close8 years
Civil & waterproofing5 years
Paint & finishes2 years
Cert WC- ECR 0431 · issued 23 Feb 2026
09
The number on the quote is the number we paid. After being burned once, that alone sold us. The home is warm and ours, and it arrived on the day they promised.
Karthik & Divya R.
Villa owners · ECR, Chennai
5.0 / 5
the receipts, totalled

One project, measured five ways.

78
Days to deliver
100%
Delivered on time
0
Cost overrun
27
Materials verified
10yr
Warranty on custom work
your home, on the record

Want a story like this one?

Start with a free consultation and a 3D design. You only commit once the quote is locked, itemised and yours to keep.

Get a Free Quote See all our work
Quote-Lock GuaranteeVerified MaterialsOn-Time or We Pay12-yr Warranty